Project Name:
Repair Gutters Standing Seam, Hanger 290, Nellis AFB, Dec 2007
Demo Existing Gutter Membranes and Standing Seam Panels, Install New Gutter Membranes, Replace and Seal Standing Seam Panels, Removed, and Installed Elastomeric Coating on Gutters and Replaced Standing Seam Panels
Project Name:
Repair Offices and Restrooms, Weapons Load Hanger 283, Nellis AFB, Dec 2007 Contract: FA4861-07-DA001-6008
Demo Existing Gutter Membranes and Standing Seam Panels, Install New Gutter Membranes, Replace and Seal Standing Seam Panels Removed, Install Elastomeric Coating on Gutters and Replaced Standing Seam Panels, Demo Interior Office Selective Wood Framing, Demo Finishes, Drywall, VCT Flooring, Carpet, Drop Ceilings, Reconfigure Office Layouts, Steel Framing, Remodel Offices, Drywall, Drop Ceilings, Paint, Ceramic Tile/VCT, Doors and Locks, Bead Blast Office Concrete Floors, Repair Concrete, Epoxy/CRU Floors, Demo Restroom Finishes, Ceramic Tile, Accessories, Drywall, Steel Wall Framing, Remodel Restrooms Steel Framing, all Finishes, Tile, Countertops, and Accessories, Demo Paint Booth Exhaust Ducts, Repair Roof at Exhaust Ducts, Repair Epoxy/CRU Floor under Exhaust Ducts,Install New Roll-Up Door
Project Name:
Remodel Water Damaged Hotel Rooms, Nellis Inn, Nellis AFB Feb 2008,
Contract:FA4861-07-D-A001-6026
Repair Water Damaged Drywall, Scrape and Skim Coat Water Damaged Ceilings, Remove and Replace Damaged Wallpaper, Repaint Water Damaged Bathroom Ceilings, Excavate PIV Valves, Repair Landscaping around PIV Valves, Repair Asphalt around PIV Valves
Project Name:
Construct CMU Shower and Shave Facility, Construct
CMU Laundry FacilityCharlie 63 Nellis AFB, April2008
Grub and Clear Ground, Excavation, Concrete Footings and Slab, CMU Masonry Walls, Engineer and Construct Roof, Install Light Gauge Steel Trusses, Install Standing Seam Roof, Construct Interior Walls, Install Doors and Hardware, Finishes, Drywall, Tile, Paint, Insulation, Cabinets and Countertops, EpoxyFloorCoatings
Project Name:
Replace Roll-Up Doors and Install Concrete Ramps, Red Flag Bldgs, Nellis AFB, March 2008
Demo Double Steel Doors and Frames, Design and Construct Steel Trim around New Roll-Up Doors Finish and Paint Interior areas around New Steel Doors, Demo Concrete Curbing to Create Area for Ramps, Build Concrete Ramps as Needed